Tuesday, August 18, 2009

Glenn Beck Afghan


The Glenn Beck afghan is almost done. The squares are finally crocheted together and now I'm crocheting the border in blue. After that there's the million tales to be woven in. Each block is 8" square. The afghan is 8 blocks across by 10 blocks down. The squares were donated by members of the Glenn Beck group on Ravelry.

Friday, June 26, 2009

It's been a while ...

I haven't been able to do much these last few months. In April, I sawed down 5 small trees and injured both hands. A nerve conductivity test was done and my right hand has severe carpal tunnel and my left hand has minimum carpal tunnel. I've tried chiropractic to no avail. Currently I'm doing acupuncture and stretching. Unfortunately, they don't seem to be working either. I've made an appointment with the orthopedist to discuss my options.

Wednesday, April 15, 2009

Vintage Sewing Machines


My hand crank sewing machine finally got some needed adjustments and is working great. It's a 1928 Singer. When the power went out Monday night, I was able to sew by candle light. It was kind of neat.

I am now the proud owner of 2 other vintage machines: a January 1941 Singer Featherweight and a Montgomery Ward Damascus manufactured by National Sewing Machine Company (NSMC) If a company ordered a large quantity of sewing machines, NSMC would put whatever name (aka badge) on the machine that the company wanted. Montgomery Ward chose Damascus.

I need to get some more bobbins that will fit the treadle and the hand crank. The bobbins aren't easy to find. My bobbins cannot have an internal length shorter than 1 1/8" and no longer than 1 1/4".

Tuesday, March 10, 2009

Updates

I have completed 42 blocks and 1 triangle for a total of 843 pieces so far for the Dear Jane quilt. I have 213 blocks left to go. I think I'll work on some of the triangles while I still have some of this batch of brown fabric.

Saturday is the quilt show in Trenton. I and two of my friends will be dressed in Civil War attire and demonstrating period crafts. I'll be spinning wool. While I'm at the quilt show, I need to get more brown fabric for the Dear Jane quilt.

The quilt show will end my unit's reenacting season for this year and I'm ready to go down for the summer. The situation with the economy will determine if we continue next season.

I have completed 14 of the 30 squares needed for the Cat Afghan for my grandson. I was hoping to have the afghan finished by the end of this month for the Potions OWL in the Harry Potter House Cup but I'm afraid that's not going to happen. On one hand, I'm really, really disappointed. On the other, as long as the afghan's finished by November, I'll be happy.